ENTERPRISE WLAN CONSULTING · SEATTLE, WA · EST. 1995 (206) 774-1337 · info@airopath.com
Airopath

Home / Services / Validation Survey

04 · Prove

Validation Survey

Proof the network meets the requirements it was designed for.

Installation complete is not the same as requirements met. A validation survey measures the finished network against the specific coverage, capacity, and roaming criteria it was designed to hit — and documents the result. If something falls short, you find out from our report, not from your operations floor.

What we deliver

  • Onsite measurement of signal, SNR, co-channel interference, and roaming behavior
  • Verification against the original design requirements, point by point
  • Punch list of deviations with engineering-grade remediation guidance
  • Formal validation report suitable for project closeout and acceptance
  • Re-validation after fixes when required

When you need this

At the close of any deployment — especially where a third party did the installation, or where the network gates a go-live: a new fulfillment site, a store opening, a clinical floor.

Scope a validation survey engagement

Send us the basics — facility, timeline, and what's driving the project — and an engineer will follow up within one business day.

(206) 774-1337 · info@airopath.com

Start a project